BMT Smart简体中文

Engineering Blog / Procurement

What should be on a turnstile mechanism quote?

A mechanism quote should spell out the mechanical assembly, motor, controller and wiring supplied for each lane. Use that breakdown to compare offers and check the prototype shipment.

BMT Smart Editorial

Ask a supplier to itemise a mechanism before you compare unit prices. For an OEM, the useful comparison is the cost and scope of a working lane. Start by defining what your factory will supply and what you expect the drive supplier to put in the box.

Compare the quoted scope per lane

List the mounting base and drive, motor, position feedback, control board, power supply and harnesses. For each line, ask for part numbers and quantities. Add an owner for the cabinet, gate leaves, sensors and fixings so the assembly team knows which interfaces it has to complete.

Quote lineQuestion for the supplier
Mechanical driveWhat assembly and hardware arrive with each unit?
Controller and harnessWhich board revision and harness connectors are included?
Lane quantityHow many drives and controllers does the specified lane use?
DrawingsWhich revision governs installation and wiring?

Use the resulting list to check the sample shipment and record the configuration you approve. Include the leaf, mounting pattern and control-board revision in that record so the purchase order points to the same build your team tested. Use the BMT Smart mechanism catalogue to identify the drive family before requesting a model-specific parts list.

Related reading

Working on a gate specification?

Have the gate type, clear opening, leaf weight, cabinet envelope and control interface to hand.

Discuss your gate specification