Engineering Blog / Specification & installation
Choosing a Full-Height Turnstile Mechanism for a German Equipment Project
What German equipment builders should compare in a full-height turnstile mechanism, from rotor geometry through power-loss behaviour and acceptance.
A full-height turnstile drawing fixes more than the overall width of a pedestrian lane. The positions of the rotor and enclosure affect how a person enters, clears the moving arms and leaves the lane. A mechanism that appears similar in a catalogue may index through a different angle or move the rotor in a different way. An equipment builder needs a candidate that works with the intended enclosure, operating sequence and installation, then needs evidence from the complete turnstile before finalising the design.
Start with the rotor and its enclosure
The rotor layout is a good first drawing to request. Mark its axis, travel direction and stopped positions on the enclosure plan. Check where the beams, user guidance surfaces and sensor fields fit, and compare the usable passage through the movement cycle. A 90-degree and a 120-degree candidate should each be drawn with its corresponding rotor. The angle sets the step between indexed positions. The layout determines whether the moving assembly can share the available space with users and fixed parts as intended.
Shenzhen Bomin's catalogue lists two 1902 mechanisms for full-height turnstiles, the 1902-90 and 1902-120. Both model pages list a rotor load of 40 to 50 kg and two 12 W solenoids at 24 V DC. The catalogue also lists two indexing options in the 2309 series and describes that series as fully automatic. These are component references. For a purchase, obtain the current interface drawing and rated conditions for the proposed revision. Review bearing support, mounting datum, space to extract the mechanism and how the actual rotor loads the assembly.
Choose how the rotor completes a passage
Bomin describes the 1902 mechanism as using a cam, spring and hydraulic damper to manage rotor movement and stopping. Its 2309 page lists a motor and electromagnetic clutch in addition to the solenoids. For a buyer, the practical distinction concerns how the user starts and completes a passage, how the assembly comes to rest and what the controller needs to know at each stage. Build a short description of those states into the purchase brief. This gives the mechanical supplier and project team an agreed sequence to review.
If there is an existing controller, ask for the mechanism's electrical and feedback interface before committing to the enclosure design. Record supply and command requirements for the exact configuration and identify where the controller confirms the rotor's position. Have the responsible equipment engineer check which operating states need measurement on the assembled lane. A catalogue rating provides a starting point for the electrical design. Supply behaviour, stopping and restarting can then be evaluated with the production-intent controller and hardware together.
Keep component figures separate from lane acceptance
The German-language Bomin catalogue helps distinguish mechanism families, while the model pages give selected figures. For example, the manufacturer quotes 40 to 60 people per minute for the two 1902 references and 20 to 30 people per minute for the 2309 reference. When planning an installation, ask for the conditions behind any such figure. Read it alongside the credential check, instructions to the user and actual passage geometry. If the project needs measured capacity, define what counts as one completed passage and which operating configuration will be used in the test. An empty rotation measured on a jig answers a different question from a person making an authorised passage through the complete lane.
Apply the same discipline to the environmental specification. A listed operating temperature is useful for screening candidates. Enclosure exposure, water management and maintenance access still need a site design. If there is an outdoor installation, have the complete equipment specification identify the conditions and documents required for the actual location. Compare noise and usable clearance in the layout and operating mode in which those matters affect the project.
Put the power-loss sequence in the order
The 1902 and 2309 product pages offer configurations for release or continued locking when power is lost. Put the required behaviour on the selected order line so the factory and controller team see the same choice. Have the project design team decide what is appropriate for the intended site. The sample record should identify the exact mechanism, control settings and conditions addressed by the test. Ask the team to confirm the full lane's response to power loss, restoration and any relevant external command during acceptance. A mechanism option describes a component state. The complete lane has to behave as specified when the installed equipment responds.
Make a separate decision about documentation
EU machinery legislation distinguishes complete machinery from partly completed machinery. European Commission guidance identifies the Machinery Directive and the move to Regulation (EU) 2023/1230, which generally applies from 20 January 2027. The parties responsible for the equipment should check what applies to the product being placed on the market, on the relevant date, and which documents the mechanism supplier must provide. Establish the legal classification from the applicable requirements and the assembly as supplied. Ask the responsible team to agree how the conformity and site acceptance records will refer to the same hardware.
A quotation request can then be specific enough to compare suppliers. Send the rotor layout and load information, enclosure drawing, required indexing and operating sequence, and the tests planned for the complete lane. Ask for the response by model and revision, with any assumptions called out. That creates a link between the component selected on paper, the sample tested in the workshop and the assembly handed over to the site.
Working on a gate specification?
Have the gate type, clear opening, leaf weight, cabinet envelope and control interface to hand.
Discuss your gate specification